Rehrig Pacific Company A family of tradition, growth, service and innovation.
Call (800) 421-6244 or (323) 262-5145
   Skip Navigation LinksHome » The Rehrig Difference » New Product Development » Stage 4 - Tooling and Production Engineering
 
Rehrig - Stage 4 - Tooling and Production Engineering

The Rehrig Pacific Company Tooling Group acts as a liaison between the Design Department and our tooling vendors. They ensure that our molds are built to exacting specifications so that we produce high quality parts quickly and efficiently. New part designs are checked and feedback is constantly provided to avoid issues that could affect cycle times, product quality or production efficiencies.

In addition, the Tooling Group uses Moldflow simulation software to ensure that the parts are filled properly with minimal warp and proper shrinkage. After final Customer approval and a comprehensive internal review, the part is released to the tooling vendor for the mold build.

Prior to production, the tool is completely debugged to ensure that both design and tooling specifications are met.

After the mold build is complete Rehrig Pacific engineers attend the mold trial and observe pre-production parts being molded. Our process engineers continue to work with the mold builder to optimize molding efficiency while our design engineers scrutinize the pre-production parts to ensure accuracy. Product functionality and performance, such as snap fits and deformation limits, are checked measured against specifications. As soon as we are satisfied both production and performance specifications will be met or exceeded the mold is shipped to one of Rehrig Pacific’s manufacturing locations.





Stage 1 - Concept Generation
Stage 2 - Concept Evaluation
Stage 3 - Design Engineering and Validation
Stage 4 - Tooling and Production Engineering
Stage 5 - Commercial Introduction and Launch


 
New Product Development
Technical Capabilities
Rehrig Environmental
International
News and Press
RPL Logistics
Info and Quote Requests
Free Webinar